Latest Activity

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London

COLPAI Project Weekly Works Update - Monday 2 September 2019

Dear Neighbour

Please see below activities relating to the COLPAI Project, which are due to take place from Monday 2 September 2019.

Monday 2 August - Friday 6 September
Works will include:

  • Breaking out hardstanding concrete along Golden Lane
  • Work on the Golden Lane footpath to install access crossover
  • Installation of a temporary heras fence hoarding along Basterfield Service Road
  • Instillation of temporary heras fence hoarding along Hatfield House and Baltic Street 
  • Removal of obstructions in ground
  • Lorries bringing backfill material into site
  • Excavators filling muck away lorries
  • Asbestos watching brief
  • Air quality monitoring
  • Environmental monitoring.

Saturday 7 September - Sunday 8 September

  • No works.

Notable Points

  • Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive  
  • An environmental air analyst will be present to monitor the site during works
  • Works on the Golden Lane footpath will result in one section of the footpath being closed, with traffic management in place
  • Basterfield Service Road - access for emergency vehicles will be clear at all times
  • Access to Hatfield House bin store will be clear at all times

 
CCTV on site

  • For additional security, ISG has installed a CCTV monitoring system. The site is monitored 24 hours a day, seven days a week. This system is only active within the site boundary and cannot be directed outside the boundary lines
  • A security guard is now on-site everyday between 7.00am - 6.30pm.

 
Deliveries

  • Muck-away lorries.

 
Non-ISG Works

  • Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site.

 
Working Hours
Monday to Friday 08:00 to 18:00
Saturday 9:00 to 14:00
 
Consented Reduced Impact Hours
During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery.
Monday to Friday 10:00 to 12:00 and 14:00 to 16:00
 
Noise, dust and vibration monitoring is in place. 
 
For site emergencies, please contact:
 
Steven McCarthy, ISG 
T: 07825 719 496
Stephen Beattie, ISG 
T: 07816 418 156

Views: 34

Reply to This

© 2024   Created by Paul Lincoln.   Powered by

Badges  |  Report an Issue  |  Terms of Service